|
Posted by: pampapilot99 on 2007-02-13, 18:48:40
Cost Index (CI) is the relationship or ratio between time and the cost of fuel. It is based on a balance. At a higher Mach Number, the fuel cost will be greater, but it will be balanced out by the fact that the time factor is lower, and vice-versa. Flight Management Systems are able to come up with the Mach number and altitude to balance the time cost with the fuel cost, therefore establishing a CI. Each aircraft type and each airline will have unique values for this index. |